This full equipment install includes Gym Gear Cardio, Strength, and Free Weights Equipment to cater for the college’s needs. Installed over the Christmas break to ensure that there was no disruption to the college timetable, the new gym is already providing to be a massive hit.
This project has been in development for over 6 months whereby various layout designs have been considered to ensure that the final room plan was as good as possible.